|
Note: If you are installing the system in an existing aquarium, pleae see Question A in th F.A.Q. section.

To watch an installation video, click here. (If video does not start please "Right Click -> Save As)

A. Insert the bottom tubes, side with holes facing down, into the outlets of the towers.

B. Position a tower in each corner of the aquarium.

C. Assemble the bottom planks and pegs.
Use the pegs to fit the square plates and corner plates together. Attach the side
plates to the perimeter of each plate set.

D. After rinsing your gravel, pour into the aquarium. Use enough gravel for at least 2 inches of depth. Pack gravel tightly against the towers to secure their place in the corners of the aquarium.

E. Fill the aquarium with water and plug in the towers.

F. Install the EP-300 power filter on the back of the aquarium. Once the unit is plugged in, submerge the filter media (Clean Magic) in between and to the left of the 2 filter cartridges. If the unit does not immediately begin pumping water, dump a cup of the tank water into the filter to prime it.
G. Add the appropriate amount of
Bio Magic and
Vita Magic for the water volume of the tank.

H. Use the pair of adjustable check valves included in your kit if you need the Zero Water Change System to operate silently and/or plan to use an air pump. Simply insert a check valve
(clear side in, rubber side out) into each airline tube coming
out of top of the filter towers. Make sure the air control knob
is turned to HI in order to increase oxygen flow to the filter.
If you are using an air pump, please read the instructions
on the back of the check valve pack.
|